ListarGrupo de Construción (GCONS) por tema "Hybrid"
Mostrando ítems 1-1 de 1
-
The Arousa Island bridge. Complete refurbishment and 10 years analysis description
(Wiley, 2024)[Abstract:] The Isla de Arousa Bridge, 1980 m long, is the only road access to Isla de Arousa. Built in 1985, this single-cell box girder divided into 40 spans runs entirely over the sea. In response to corrosion damage, ...