Probabilistic Life-Cycle Cost Analysis for Renewable and Non-renewable Power Plants

UDC.coleccionInvestigaciónes_ES
UDC.departamentoEnxeñaría Civiles_ES
UDC.departamentoCiencias da Navegación e Enxeñaría Mariñaes_ES
UDC.endPage787es_ES
UDC.grupoInvGrupo de Enxeñaría e Dirección de Proxectos (GRIDP)es_ES
UDC.grupoInvGrupo de Enxeñaría Mixto (GEM)es_ES
UDC.institutoCentroCITENI - Centro de Investigación en Tecnoloxías Navais e Industriaises_ES
UDC.journalTitleEnergyes_ES
UDC.startPage774es_ES
UDC.volume112es_ES
dc.contributor.authorCartelle Barros, Juan José
dc.contributor.authorLara, Manuel
dc.contributor.authorCruz, M. Pilar de la
dc.contributor.authorCaño, Alfredo del
dc.date.accessioned2024-11-25T12:27:00Z
dc.date.available2024-11-25T12:27:00Z
dc.date.issued2016-10
dc.descriptionManuscrito aceptadoes_ES
dc.description.abstract[Abstract] Two probabilistic models are presented to assess the costs of power plants. One of them uses requirement trees, value functions and the analytic hierarchy process. It is also based on Monte Carlo simulation. The second one is a mathematical model for calculating the levelised cost of electricity (LCOE) based on discounted cash flow techniques, and combined with Monte Carlo simulation. The results obtained with both models are compared and discussed. On the one hand, the LCOE model provides the most reliable results. These results reinforce the idea that conventional or coal, lignite, oil, natural gas and nuclear power plants are still the most competitive options, with the LCOE falling in a range of around 25 to 200 €/MWh and mean values approaching 70 €/MWh. Generally, renewable power plants obtained the worst results, with a LCOE varying from around 30 to more than 450 €/MWh. Nevertheless, this study demonstrates that renewable alternatives can compete with their conventional counterparts under certain conditions.es_ES
dc.description.sponsorshipThe present work was supported by the Galician Ministry of Culture, Education and University Planning under the Pre-doctoral Stage Support Program of the Galician Plan of Research, Innovation and Growth 2011–2015 (Plan I2C), grant ED481A-2015/200.es_ES
dc.description.sponsorshipXunta de Galicia; ED481A-2015/200es_ES
dc.identifier.citationCartelle Barros JJ, Lara Coira M, De La Cruz López MP, Del Caño Gochi A. Probabilistic life-cycle cost analysis for renewable and non-renewable power plants. Energy 2016;112:774–87. https://doi.org/10.1016/j.energy.2016.06.098.es_ES
dc.identifier.doihttps://doi.org/10.1016/j.energy.2016.06.098
dc.identifier.issn1873-6785
dc.identifier.urihttp://hdl.handle.net/2183/40286
dc.language.isoenges_ES
dc.publisherElsevieres_ES
dc.relation.urihttps://doi.org/10.1016/j.energy.2016.06.098es_ES
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International https://creativecommons.org/licenses/by-nc-nd/4.0/es_ES
dc.rights.accessRightsopen accesses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/*
dc.subjectMIVESes_ES
dc.subjectLevelised cost of electricity (LCOE)es_ES
dc.subjectMonte Carloes_ES
dc.subjectConventional power plantses_ES
dc.subjectRenewable energieses_ES
dc.subjectLife cycle analysises_ES
dc.titleProbabilistic Life-Cycle Cost Analysis for Renewable and Non-renewable Power Plantses_ES
dc.typejournal articlees_ES
dspace.entity.typePublication
relation.isAuthorOfPublicatione7414bcb-674f-43e8-bc5a-468f215facf5
relation.isAuthorOfPublication03962ecc-78af-4147-b1ac-8ee29e2a574e
relation.isAuthorOfPublication84f1293a-42f9-4112-81f4-4c302615fd8b
relation.isAuthorOfPublication230e0252-6288-47d5-bda4-7658cf0a4b8f
relation.isAuthorOfPublication.latestForDiscoverye7414bcb-674f-43e8-bc5a-468f215facf5

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Cartelle-Barros_J_2016_Probabilistic_life-cycle_cost_analysis_for_renewable.pdf
Size:
628.19 KB
Format:
Adobe Portable Document Format
Description: