The Arousa Island bridge. Complete refurbishment and 10 years analysis description

UDC.coleccionInvestigaciónes_ES
UDC.departamentoEnxeñaría Civiles_ES
UDC.endPage1570es_ES
UDC.grupoInvGrupo de Construción (GCONS)es_ES
UDC.institutoCentroCITEEC - Centro de Innovación Tecnolóxica en Edificación e Enxeñaría Civiles_ES
UDC.issue3es_ES
UDC.journalTitleStructural Concretees_ES
UDC.startPage1554es_ES
UDC.volume25es_ES
dc.contributor.authorBecerra-Mosquera, José Antonio
dc.contributor.authorCarro-López, Diego
dc.contributor.authorHerrador, Manuel
dc.date.accessioned2024-07-26T12:30:30Z
dc.date.available2024-07-26T12:30:30Z
dc.date.issued2024
dc.description.abstract[Abstract:] The Isla de Arousa Bridge, 1980 m long, is the only road access to Isla de Arousa. Built in 1985, this single-cell box girder divided into 40 spans runs entirely over the sea. In response to corrosion damage, the local government decided to make an intervention with an ambitious repair project in 2009. The repair, carried out with three different techniques, aims to collect data for future repairs. In this research the results of rehabilitation and comparison of the evolution of the repairs are described, together with the data on the progression of corrosion and its effect on the life cycle. At the moment, with data from 10 years of protection, both hybrid and galvanic anodes installation have shown effectiveness. Bridge Health index analysis shows that after reparation, the bridge presented a very good condition, and even after 10 years the condition is still good, except for some damaged bearings.es_ES
dc.identifier.citationBecerra-Mosquera, J. A., Carro-López, D., Herrador, M. F. (2024). The Arousa Island bridge. Complete refurbishment and 10 years analysis description. Structural Concrete, 25(3), 1554-1570. https://doi.org/10.1002/SUCO.202200377es_ES
dc.identifier.doi10.1002/SUCO.202200377
dc.identifier.urihttp://hdl.handle.net/2183/38265
dc.language.isoenges_ES
dc.publisherWileyes_ES
dc.relation.urihttps://doi.org/10.1002/suco.202200377es_ES
dc.rightsAtribución 3.0 Españaes_ES
dc.rights.accessRightsopen accesses_ES
dc.rights.urihttp://creativecommons.org/licenses/by/3.0/es/*
dc.subjectBridge condition indexes_ES
dc.subjectCathodices_ES
dc.subjectCorrosiones_ES
dc.subjectGalvanices_ES
dc.subjectHybrides_ES
dc.subjectImpress currentes_ES
dc.subjectReinforced concretees_ES
dc.subjectRepaires_ES
dc.titleThe Arousa Island bridge. Complete refurbishment and 10 years analysis descriptiones_ES
dc.typejournal articlees_ES
dspace.entity.typePublication
relation.isAuthorOfPublication2110ab28-f4f4-4571-9d6a-d6638b526556
relation.isAuthorOfPublication433260f8-94fc-4824-b3bd-5f86ef51059b
relation.isAuthorOfPublication.latestForDiscovery2110ab28-f4f4-4571-9d6a-d6638b526556

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
CarroLopezD_2024_Arousa-Island-bridge_FIB-25-3-1554.pdf
Size:
9.68 MB
Format:
Adobe Portable Document Format
Description: