Analysis of Contracts to Build Energy Infrastructures to Optimize the OPEX

UDC.coleccionInvestigaciónes_ES
UDC.departamentoEnxeñaría Naval e Industriales_ES
UDC.grupoInvMaterials and Renewable Energy for Engineering, Environment and Sustainability (MARES)es_ES
UDC.issue17es_ES
UDC.journalTitleSustainabilityes_ES
UDC.volume12es_ES
dc.contributor.authorLosada Maseda, Jesús Javier
dc.contributor.authorCastro-Santos, Laura
dc.contributor.authorGraña-López, Manuel Ángel
dc.contributor.authorGarcía-Diez, Ana
dc.contributor.authorFilgueira-Vizoso, Almudena
dc.date.accessioned2020-10-08T11:11:20Z
dc.date.available2020-10-08T11:11:20Z
dc.date.issued2020-09-03
dc.description.abstract[Abstract] The employer (owner) of the project wants to obtain the maximum profit for the money invested and the consultant (contractor) will try to give less for that money. The regulation of their relationship is based on the contractual agreement, which in the energy sector is mainly based on the engineering, procurement, and construction (EPC) model. The objective of this work was to evaluate which factors should be included in the drafting of contracts, to minimize problems between the parties, and thus minimize execution costs and optimize operation and maintenance costs. Information and data on the integration of operability and maintainability criteria in contracts for 158 projects, with a total contract value of close to €40,000M, were analyzed. Several of those projects corresponded to wind, solar, and hydroelectric plants. The information collected the perception of the agents involved, and was classified according to the experience of the agents consulted in the operation and maintenance areas. Finally, the proposed criteria were prioritized. In general, the owner is willing to introduce these criteria in his contracts if they reduce the operation and maintenance cost by around 1–5%, while the contractor is interested in increasing his probability to be selected byes_ES
dc.identifier.citationLosada-Maseda, J.J.; Castro-Santos, L.; Graña-López, M.Á.; García-Diez, A.I.; Filgueira-Vizoso, A. Analysis of Contracts to Build Energy Infrastructures to Optimize the OPEX. Sustainability 2020, 12, 7232. https://doi.org/10.3390/su12177232
dc.identifier.doi10.3390/su12177232
dc.identifier.doi10.3390/su12177232
dc.identifier.issn2071-1050
dc.identifier.urihttp://hdl.handle.net/2183/26379
dc.language.isoenges_ES
dc.publisherMDPIes_ES
dc.relation.urihttps://doi.org/10.3390/su12177232es_ES
dc.rightsAtribución 4.0 Internacionales_ES
dc.rights.accessRightsopen accesses_ES
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/*
dc.subjectEngineeringes_ES
dc.subjectProcurementes_ES
dc.subjectConstruction (EPC)es_ES
dc.subjectContract
dc.subjectOperability
dc.subjectMaintainability
dc.titleAnalysis of Contracts to Build Energy Infrastructures to Optimize the OPEXes_ES
dc.typejournal articlees_ES
dspace.entity.typePublication
relation.isAuthorOfPublication4e6dc7fe-9f3f-4210-9f17-090e43e1af6f
relation.isAuthorOfPublicationfc753347-372b-4f30-95c6-2de02283d0b3
relation.isAuthorOfPublication97f57c26-7af7-4924-9b8f-7964a2e4ba52
relation.isAuthorOfPublicatione892f63d-d304-4433-92e8-8d9dedd32ed2
relation.isAuthorOfPublication8e124305-8d3a-476e-b8d4-bcd83742dc21
relation.isAuthorOfPublication.latestForDiscovery4e6dc7fe-9f3f-4210-9f17-090e43e1af6f

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
sustainability-12-07232-v2.pdf
Size:
2.37 MB
Format:
Adobe Portable Document Format
Description: