A Constrained Programming Model for the Optimization of Industrial-Scale Scheduling Problems in the Shipbuilding Industry

UDC.coleccionInvestigaciónes_ES
UDC.departamentoCiencias da Computación e Tecnoloxías da Informaciónes_ES
UDC.grupoInvGrupo Integrado de Enxeñaría (GII)es_ES
UDC.issue8es_ES
UDC.journalTitleJournal of Marine Science and Engineeringes_ES
UDC.volume11es_ES
dc.contributor.authorPernas-Álvarez, Javier
dc.contributor.authorCrespo Pereira, Diego
dc.date.accessioned2024-06-19T14:30:28Z
dc.date.available2024-06-19T14:30:28Z
dc.date.issued2023-07-29
dc.description.abstract[Abstract]: This work presents an innovative constrained programming model for solving a flexible job-shop scheduling problem with assemblies and limited buffer capacity based on a real case from the shipbuilding industry. Unlike the existing literature, this problem incorporates the manufacturing and assembly of blocks from subblocks to the final ship erection, while considering the limited buffer capacity due to the size of blocks, which has been often overlooked. The objectives considered are the minimization of the makespan and tardiness based on ship erection due dates. To demonstrate the model’s effectiveness, it is initially validated using various scheduling problems from the literature. Then, the model is applied to progressively challenging instances of the shipbuilding problem presented in this work. Finally, the optimization results are validated and analyzed using a comprehensive simulation model. Overall, this work contributes to reducing the gap between academia and industry by providing evidence of the convenience of the application of constrained programming models combined with simulation models on industrial-size scheduling problems within reasonable computational time. Moreover, the paper emphasizes originality by addressing unexplored aspects of shipbuilding scheduling problems and highlights potential future research, providing a robust foundation for further advancements in the field.es_ES
dc.identifier.citationPernas-Álvarez, J.; Crespo-Pereira, D. A Constrained Programming Model for the Optimization of Industrial-Scale Scheduling Problems in the Shipbuilding Industry. J. Mar. Sci. Eng. 2023, 11, 1517. https://doi.org/10.3390/jmse11081517es_ES
dc.identifier.doihttps://doi.org/10.3390/JMSE11081517
dc.identifier.issn2077-1312
dc.identifier.urihttp://hdl.handle.net/2183/37165
dc.language.isoenges_ES
dc.publisherMDPIes_ES
dc.relation.urihttps://doi.org/10.3390/JMSE11081517es_ES
dc.rightsCC BY https://creativecommons.org/licenses/by/4.0/es_ES
dc.rights.accessRightsopen accesses_ES
dc.rights.urihttp://creativecommons.org/licenses/by/3.0/es/*
dc.subjectShipbuildinges_ES
dc.subjectMILPes_ES
dc.subjectCPes_ES
dc.subjectSchedulinges_ES
dc.subjectOptimizationes_ES
dc.titleA Constrained Programming Model for the Optimization of Industrial-Scale Scheduling Problems in the Shipbuilding Industryes_ES
dc.typejournal articlees_ES
dspace.entity.typePublication
relation.isAuthorOfPublication4a9f289c-9027-4bdf-9a32-eb5697eae284
relation.isAuthorOfPublicatione0956b81-4982-4fc5-b068-fda3af8ab3db
relation.isAuthorOfPublication.latestForDiscovery4a9f289c-9027-4bdf-9a32-eb5697eae284

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Pernas_Alvarez_Javier_2023_A_Constrained_Programming_Model_Optimization_Industrial-Scale_Scheduling_Problems_Shipbuilding_Industry.pdf
Size:
5.81 MB
Format:
Adobe Portable Document Format
Description: