Importance of the fluctuations of the steel price in the economic feasibility of a hybrid offshore platform in the West of the Iberian Peninsula
Use este enlace para citar
http://hdl.handle.net/2183/37170Colecciones
- GI-CIM - Artigos [27]
Metadatos
Mostrar el registro completo del ítemTítulo
Importance of the fluctuations of the steel price in the economic feasibility of a hybrid offshore platform in the West of the Iberian PeninsulaFecha
2022-09Cita bibliográfica
A. Filgueira-Vizoso, X. Costoya, D. Cordal-Iglesias, y L. Castro-Santos, «Importance of the fluctuations of the steel price in the economic feasibility of a hybrid offshore platform in the West of the Iberian Peninsula», Renewable Energy and Power Quality Journal, vol. 20, n.º 4, pp. 520-524 , 2022, doi: 10.24084/repqj20.353
Resumen
[Abstract]: Marine renewable energies are being implemented as
basic energy sources of the Spanish energy system for various
reasons, the first because the planet Earth is made up of 70%
water, which makes marine resources very important when
programming the production, the second because they are clean
energies that do not emit greenhouse gases, necessary to comply
with the European Green Deal and the third because this type of
energy provides us with energy independence from third
countries. But, despite the social benefits mentioned above, we
also have to take into account economic factors that can make the
economic profitability of this type of equipment less viable. For
this, the wind resource, platform costs, etc. are analyzed. Within
these factors, this research focuses on seeing how the variation in
the price of steel (the main material used in this equipment) caused
by the increase in the cost of electricity causes the main economic
parameters to vary for a park made up of W2Power hybrid
platforms. of 300 MW located on the Atlantic coast of the Iberian
Peninsula.
Palabras clave
Renewable energy
Hybrid platforms
Iron
Atlantic Area
Hybrid platforms
Iron
Atlantic Area
Versión del editor
ISSN
2172-038X