Mostrar o rexistro simple do ítem

dc.contributor.authorLópez González, Cándido
dc.contributor.authorCarreiro Otero, María
dc.contributor.authorGarcía-Navarro, Justo
dc.date.accessioned2024-02-19T10:57:22Z
dc.date.available2024-02-19T10:57:22Z
dc.date.issued2014-12-05
dc.identifier.citationLópez-González, C., Carreiro-Otero, M. y García Navarro, J. (2014). Génesis y período vital del Frontón Recoletos. Informes de la Construcción 66(536), e040. http://dx.doi.org/10.3989/ic.14.060es_ES
dc.identifier.issn0020-0883
dc.identifier.urihttp://hdl.handle.net/2183/35649
dc.description.abstract[Resumen] El artículo analiza un singular paradigma arquitectónico, el Frontón Recoletos, fruto de la colaboración entre el arquitecto Secundino Zuazo y el ingeniero Eduardo Torroja. Se plantea describir el proceso de ideación, entre el proyecto inicial de abril de 1935 y la elaboración definitiva en septiembre del mismo año, así como ilustrar las permanencias y mutaciones de la obra durante la fase de ejecución. Del mismo modo, el relato de su ciclo vital ilustra la diversidad de usos que acogió. Dañado durante la guerra civil, se reconstruye para desaparecer en 1973. Se pierde así una de las piezas más significativas de la arquitectura española contemporánea. El texto muestra la colaboración entre dos disciplinas que, mediante sucesivas aproximaciones, transforman substancialmente el espacio arquitectónico fusionando armónicamente forma, función y estructura, a la par que pone de relieve la naturaleza versátil de una pieza que fue ideada con un marcado carácter de especialización.es_ES
dc.description.abstract[Abstract] The Recoletos Pelota Court is a unique model of architectural harmony, created in collaboration by the architect Secundino Zuazo and the engineer Eduardo Torroja. This paper examines the evolution of the Recoletos project from its initial conception in April 1935 to the finalisation of the plans in September of the same year, how the design was implemented and adapted during the phase of construction, and the variety of uses acquired by the building over the course of its lifetime. Though restored after the damage suffered during the Spanish civil war, the structure was finally demolished in 1973, resulting in the loss of one of the most important buildings in contemporary Spanish architecture. The study explores the collaboration between two different disciplines and their successive refinements of the design to achieve an intimate harmony of form, function and structure that transformed the architectural space of the building. Finally, it illustrates the ultimate versatility of a structure conceived for a specific use.es_ES
dc.language.isospaes_ES
dc.publisherConsejo Superior de Investigaciones Científicas, CSICes_ES
dc.relation.urihttp://dx.doi.org/10.3989/ic.14.060es_ES
dc.rightsAtribución-NoComercial-SinDerivadas 3.0 Españaes_ES
dc.rightsAtribución-NoComercial-SinDerivadas 3.0 Españaes_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/es/*
dc.subjectFrontón Recoletoses_ES
dc.subjectTorrojaes_ES
dc.subjectZuazoes_ES
dc.subjectEstructuraes_ES
dc.subjectEspacio arquitectónicoes_ES
dc.subjectRecoletos Pelota Courtes_ES
dc.subjectStructurees_ES
dc.subjectArchitectural spacees_ES
dc.titleGénesis y período vital del Frontón Recoletoses_ES
dc.title.alternativeRecoletos Pelota Court, genesis and vital periodes_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.rights.accessinfo:eu-repo/semantics/openAccesses_ES
UDC.journalTitleInformes de la Construcciónes_ES
UDC.volume66es_ES
UDC.issue536es_ES


Ficheiros no ítem

Thumbnail
Thumbnail

Este ítem aparece na(s) seguinte(s) colección(s)

Mostrar o rexistro simple do ítem