Skip navigation
  •  Inicio
  • UDC 
    • Cómo depositar
    • Políticas del RUC
    • FAQ
    • Derechos de autor
    • Más información en INFOguías UDC
  • Listar 
    • Comunidades
    • Buscar por:
    • Fecha de publicación
    • Autor
    • Título
    • Materia
  • Ayuda
    • español
    • Gallegan
    • English
  • Acceder
  •  Español 
    • Español
    • Galego
    • English
  
Ver ítem 
  •   RUC
  • Escola Técnica Superior de Enxeñaría de Camiños, Canais e Portos
  • Investigación (ETSECCP)
  • Ver ítem
  •   RUC
  • Escola Técnica Superior de Enxeñaría de Camiños, Canais e Portos
  • Investigación (ETSECCP)
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Fail-safe optimum cable system under cable breakage in cable-stayed bridges. Application to the Queensferry Crossing Bridge

Thumbnail
Ver/Abrir
Soto-N_2023_ES-279-115557.pdf (1.817Mb)
Use este enlace para citar
http://hdl.handle.net/2183/32800
Atribución-NoComercial-SinDerivadas 3.0 España
Excepto si se señala otra cosa, la licencia del ítem se describe como Atribución-NoComercial-SinDerivadas 3.0 España
Colecciones
  • Investigación (ETSECCP) [826]
Metadatos
Mostrar el registro completo del ítem
Título
Fail-safe optimum cable system under cable breakage in cable-stayed bridges. Application to the Queensferry Crossing Bridge
Autor(es)
Soto Méndez, Noel
Cid, Clara
Baldomir, Aitor
Hernández, Santiago
Fecha
2023
Cita bibliográfica
Soto, N., Cid, C., Baldomir, A., & Hernández, S. (2023). Fail-safe optimum cable system under cable breakage in cable-stayed bridges. Application to the Queensferry Crossing Bridge. Engineering Structures, 279, 115557. https://doi.org/10.1016/j.engstruct.2022.115557
Resumen
[Abstract:] This paper presents a methodology to optimize the cable system in cable-stayed bridges, whose main novelty is to take into account the accidental breakage of one cable within the design process. To this end, a multi-model optimization strategy is proposed by establishing design constraints on both the intact and damaged models. The dynamic effect of cable breakage is accounted for in the damaged models by the application of impact loads at the tower and deck anchorages. The objective function is to minimize the steel volume in the cable system by varying the cable anchor positions on the deck, the number of cables, the cross sectional areas and prestressing forces. This approach is applied to the Queensferry Crossing Bridge, the longest three-tower cable-stayed bridge in the world and also the largest with crossing cables in the central spans. The fail-safe optimization of the cable system leads to a different layout than the optimum design without considering cable breakage, with more cables and smaller areas, having a minimum penalty in steel volume.
Palabras clave
Cable-stayed bridge
Optimum design
Fail-safe
Cable breakage
Crossing cables
 
Descripción
Financiado para publicación en acceso aberto: Universidade da Coruña/CISUG
Versión del editor
https://doi.org/10.1016/j.engstruct.2022.115557
Derechos
Atribución-NoComercial-SinDerivadas 3.0 España

Listar

Todo RUCComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasGrupo de InvestigaciónTitulaciónEsta colecciónPor fecha de publicaciónAutoresTítulosMateriasGrupo de InvestigaciónTitulación

Mi cuenta

AccederRegistro

Estadísticas

Ver Estadísticas de uso
Sherpa
OpenArchives
OAIster
Scholar Google
UNIVERSIDADE DA CORUÑA. Servizo de Biblioteca.    DSpace Software Copyright © 2002-2013 Duraspace - Sugerencias