Skip navigation
  •  Home
  • UDC 
    • Getting started
    • RUC Policies
    • FAQ
    • FAQ on Copyright
    • More information at INFOguias UDC
  • Browse 
    • Communities
    • Browse by:
    • Issue Date
    • Author
    • Title
    • Subject
  • Help
    • español
    • Gallegan
    • English
  • Login
  •  English 
    • Español
    • Galego
    • English
  
View Item 
  •   DSpace Home
  • Escola Politécnica de Enxeñaría de Ferrol
  • Traballos académicos (EPEF)
  • View Item
  •   DSpace Home
  • Escola Politécnica de Enxeñaría de Ferrol
  • Traballos académicos (EPEF)
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Construcción de una nave para fabricación de tubos de acero

Thumbnail
View/Open
HermidaVeiga_Sergio_TFM_2020.pdf (19.86Mb)
Use this link to cite
http://hdl.handle.net/2183/31779
Collections
  • Traballos académicos (EPEF) [444]
Metadata
Show full item record
Title
Construcción de una nave para fabricación de tubos de acero
Alternative Title(s)
Construcción dunha nave para un fabricación de tubos de aceiro
Warehouse project and sustainability comparative analysis of its structure in function with the use of different materials
Author(s)
Hermida Veiga, Sergio
Directors
Fernández Martínez, José
Date
2020
Center/Dept./Entity
Universidade da Coruña. Escola Politécnica Superior
Description
Traballo fin de mestrado (UDC.EPS). Enxeñaría industrial. Curso 2019/2020
Abstract
[Resumen] En el presente trabajo fin de máster se realiza el diseño de una nave industrial y de un edificio anexo de dos plantas, la nave es destinada a la instalación de un taller para producción de tubos de acero para suministrar a las diferentes empresas dedicadas al montaje de tuberías cercanas a la situación de la nave y en el edificio anexo se realizarán las tareas administrativas y de gestión de la empresa. Se realiza el diseño de la distribución en planta de las edificaciones teniendo en cuenta la actividad que se va a realizar en ellas, prestando especial atención en los lugares de trabajo, el tránsito de vehículos y la carga y descarga de los diferentes materiales necesarios para la producción, y el cálculo estructural de ambas edificaciones. Para definir lo proyectado, así como los términos legales, urbanísticos y de seguridad el presente proyecto consta de los siguientes documentos: Memoria, Anejos a la memoria, Planos, Pliego de condiciones y presupuesto.
 
[Resumo] No presente traballo fin de máster realizase o deseño dunha nave industrial e dun edificio anexo de duas plantas, a nave destínase a instalación dun taller para a producción de tubos de aceiro para o suministro das diferentes empresas de montaxe de tuberías cercanas a situación da nave, e no edificio anexo realizaranse tarefas administrativas e de xestión do taller. Realizase o deseño da distribución en planta das edificaciónstendo en conta a actividade que realizarasenelas, prestando especial atención nos lugares de traballo, no tránsito de vehículos e a carga e descarga das materias necesarias para a producción e o cálculo estructural de ambas edificacións. Para definir o proxectado, así coma os termos legais, urbanísticos e de seguridade o presente documento consta: Memoria, Anexos a memoria, Planos, Prego de condición e Presuposto.
 
[Abstract] In this master's thesis, the design of an industrial building and an annex building with two floors is carried out, the industrial building is destined to the installation of a workshop for the production of steel tubes to supply the different companies dedicated to the assembly of pipes close to the situation of the ship and in the annex building the administrative and management tasks of the company will be carried out. The design of the plant layout of the buildings is carried out taking into account the activity that is going to be carried out in them, paying special attention in the workplaces, the traffic of vehicles and the loading and unloading of the different materials necessary for the production, and the structural calculation of both buildings. To define the projected, as well as the legal, urban and security terms, the present project consists of the following documents: Memory, Plans, solicitation documents and budget.
 
Keywords
Construcciones industriales-Diseño y construcción
Rights
Os titulares dos dereitos de propiedade intelectual autorizan a visualización do contido deste traballo a través de Internet, así como a súa reproducción, gravación en soporte informático ou impresión para o seu uso privado e/ou con fins de estudo e de investigación. En nengún caso se permite o uso lucrativo deste documento. Estos dereitos afectan tanto ó resumo do traballo como o seu contido Los titulares de los derechos de propiedad intelectual autorizan la visualización del contenido de este trabajo a través de Internet, así como su repoducción, grabación en soporte informático o impresión para su uso privado o con fines de investigación. En ningún caso se permite el uso lucrativo de este documento. Estos derechos afectan tanto al resumen del trabajo como a su contenido

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsResearch GroupAcademic DegreeThis CollectionBy Issue DateAuthorsTitlesSubjectsResearch GroupAcademic Degree

My Account

LoginRegister

Statistics

View Usage Statistics
Sherpa
OpenArchives
OAIster
Scholar Google
UNIVERSIDADE DA CORUÑA. Servizo de Biblioteca.    DSpace Software Copyright © 2002-2013 Duraspace - Send Feedback