Mostrar o rexistro simple do ítem

dc.contributor.authorFernández Ruiz, Jesús
dc.contributor.authorMiranda, Marina
dc.contributor.authorCastro González, Jorge
dc.contributor.authorMedina-Rodríguez, Luis
dc.date.accessioned2021-10-25T16:14:22Z
dc.date.available2021-10-25T16:14:22Z
dc.date.issued2021
dc.identifier.citationFernández-Ruiz, J., Miranda, M., Castro, J., Rodríguez, L. M. 2021. Improvement of the critical speed in high-speed ballasted railway tracks with stone columns: A numerical study on critical length. Transportation Geotechnics, 30, 100628.es_ES
dc.identifier.urihttp://hdl.handle.net/2183/28719
dc.descriptionFinanciado para publicación en acceso aberto: Universidade da Coruña/CISUGes_ES
dc.description.abstract[Abstract] The pressure to achieve a higher speed of train operation has increased in the last few years due to the development of high-speed railway lines. In the presence of soft soils, this speed increase is not possible without undertaking soil improvement measures, since the critical speed is lower than the desired speed of train operation. One of the most widely used soil improvement techniques is that of stone columns. In relation to these is the concept of critical length which, up to now, has only been studied for static cases. This research focuses, for the first time, on the enhancement of the critical speed in high-speed railways with stone columns and with special reference to critical length. Moreover, others parameters such as: maximum rail displacement and Dynamic Amplification Factor (DAF) are also studied. Analysing three profiles of ground representative of soft soils, it can be observed how the effect of the stone columns on critical speed is relevant, showing that critical length is different with respect to the three parameters above, the most restrictive one being that which corresponds to the critical speed. The influence of other parameters on the critical length and on the effectiveness of stone columns, such as the area replacement ratio, the dynamic pressure bulb and the existing soil stiffness is analysed and discussed.es_ES
dc.language.isoenges_ES
dc.publisherElsevieres_ES
dc.relation.urihttps://doi.org/10.1016/j.trgeo.2021.100628es_ES
dc.rightsAtribución-NoComercial-SinDerivadas 4.0 Internacionales_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectStone columnses_ES
dc.subjectCritical lengthes_ES
dc.subjectCritical speedes_ES
dc.subjectHigh-speed railway lineses_ES
dc.subject3D dynamic numerical modeles_ES
dc.titleImprovement of the Critical Speed in High-Speed Ballasted Railway Tracks With Stone Columns: A Numerical Study on Critical Lengthes_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.rights.accessinfo:eu-repo/semantics/openAccesses_ES
UDC.journalTitleTransportation Geotechnicses_ES
UDC.volume30es_ES
UDC.startPage100628es_ES
dc.identifier.doi10.1016/j.trgeo.2021.100628


Ficheiros no ítem

Thumbnail
Thumbnail

Este ítem aparece na(s) seguinte(s) colección(s)

Mostrar o rexistro simple do ítem