Skip navigation
  •  Inicio
  • UDC 
    • Cómo depositar
    • Políticas do RUC
    • FAQ
    • Dereitos de Autor
    • Máis información en INFOguías UDC
  • Percorrer 
    • Comunidades
    • Buscar por:
    • Data de publicación
    • Autor
    • Título
    • Materia
  • Axuda
    • español
    • Gallegan
    • English
  • Acceder
  •  Galego 
    • Español
    • Galego
    • English
  
Ver ítem 
  •   RUC
  • Publicacións UDC
  • Congresos e cursos UDC
  • International Congress Biotechniques for Air Pollution Control
  • International Congress on Biotechniques for Air Pollution Control ( 2º. 2007. A Coruña)
  • Ver ítem
  •   RUC
  • Publicacións UDC
  • Congresos e cursos UDC
  • International Congress Biotechniques for Air Pollution Control
  • International Congress on Biotechniques for Air Pollution Control ( 2º. 2007. A Coruña)
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Removal of dichloromethane from waste gases using a fixed-bed biotrickling filter and a continuous stirred tank bioreactor

Thumbnail
Ver/abrir
CC-92_art_48.pdf (192.0Kb)
Use este enlace para citar
http://hdl.handle.net/2183/12847
Coleccións
  • International Congress on Biotechniques for Air Pollution Control ( 2º. 2007. A Coruña) [57]
Metadatos
Mostrar o rexistro completo do ítem
Título
Removal of dichloromethane from waste gases using a fixed-bed biotrickling filter and a continuous stirred tank bioreactor
Autor(es)
Bailón Allegue, Laura
Dopico, Yolanda
Nikolausz, Marcell
Kästner, Matthias
Veiga, María Carmen
Kennes, Christian
Data
2007
Cita bibliográfica
Biotechniques for Air Pollution Control II, 2007: 505-514. ISBN: 978-84-9749-258-4
Resumo
[Abstract] A laboratory scale fixed bed biotrickling filter (BTF) and a continuous stirred tank bioreactor (CSTB) have been studied and compared for the elimination of dichloromethane from waste gases. The DCM removal efficiency in the trickling filter was > 85% for inlet loads up to 25 g.m-3.h-1 and a maximal removal capacity of about 170 g.m-3.h-1 was achieved at a load of 350 g.m-3.h-1. The continuous stirred tank bioreactor showed removal efficiencies > 90% for inlet loads up to 120 g.m-3.h-1. At this load the maximal removal capacity of the system was reached, i.e. about 100 g.m-3.h-1. Thus, higher maximum elimination capacities were reached in the BTF while higher removal efficiencies were obtained at high loads with the CSTB. Both systems presented good stability against overloads.
ISBN
978-84-9749-258-4

Listar

Todo RUCComunidades e colecciónsPor data de publicaciónAutoresTítulosMateriasGrupo de InvestigaciónTitulaciónEsta colecciónPor data de publicaciónAutoresTítulosMateriasGrupo de InvestigaciónTitulación

A miña conta

AccederRexistro

Estatísticas

Ver Estatísticas de uso
Sherpa
OpenArchives
OAIster
Scholar Google
UNIVERSIDADE DA CORUÑA. Servizo de Biblioteca.    DSpace Software Copyright © 2002-2013 Duraspace - Suxestións